This Old House TV
Share this profile
S45 E9: Phased Out
The renovation has reached the halfway point. A lesson on stucco is given. The kitchen cabinet finish is revealed, the nickel gap siding is installed, and drainage for the back patio is addressed.
Filed under:
S45 E8: Drop in the Gutter
A custom gutter is recessed into the roof overhang. The neighbor's house, one of three designed and built by the same original architect, is toured. New energy-efficient windows are installed.
S45 E7: Ramping Up
Repairs are made to the 1960 brick, including matching the original color and texture of the mortar. A DIY ramp is built, and nearby, a modern accessible house is toured. The roof trim is replaced.
S45 E6: Reworked and Rewired
Geothermal pipes are run into the house. Wood blocking is installed for the future mounting of assistive devices. The old receptacle boxes in the original brick walls are replaced without damage.
S45 E5: Gone Geo
Framing begins for a new zero-threshold sliding glass door. The geothermal heating and cooling system is explained and wells for the system begin at the house. The entrance gets a steel focal point.
S45 E4: Engineered for Accessibility
A lally column is removed and a larger ridge beam is installed to create an open kitchen and dining area. The homeowners choose hardscape finishes based on a 3D landscape design.
S45 E3: The Big Dig
A new mechanical space is being created out front and will be connected to the old mechanical space by a new concrete block wall. HVAC ducts are installed considering the new energy code.
S45 E2: Shore We Can
Construction begins on the Lexington Modern project. The new architectural plan prioritizes accessibility. An accessibility solution showroom is toured. A new energy code affects the construction.
S45 E1: On a Mission
The crew starts a new project in Lexington, MA to renovate a home to be accessible for a young boy who has Muscular Dystrophy. They meet the homeowners and tour the project.
S44 E26: A Period Restoration
A little over a year ago, renovation began on the 1720 first period home. Restoration is now complete. Tremendous care went into preserving the home's history while making modern improvements.