Kevin O’Connor helps Zack Dettmore build a job site “command center,” a spot where crew members can find safety data sheets, plans, and the project schedule all in one place.
With the command center up, Kevin joins Zack and homeowner Ethan for demo day, tearing down non-essential walls, ceilings, and old pipes. Zack carefully extracts a decorative stained glass sash, that Harley and Ethan hope to repurpose.
Downstairs, Heath Eastman teams up with electrician Matt Scezney to remove layers of old wiring, including knob and tube wiring, BX cable, NM cable, and even an outdated fuse panel.
Later, Zack walks Kevin through how he calculates lumber needs using architectural drawings and an AI-assisted takeoff list, saving time over old-school measuring methods.
Kevin visits a massive lumber distribution facility in Newark, where lumber representative Jose Silva explains how orders are picked, banded, and loaded onto trucks in the exact sequence Zack’s crew will need them on site.
Back at the house, the lumber arrives stacked and ready to go, setting up the crew to keep pushing forward with demo and framing.
Original Air Date: Oct 8, 2026, Season 48; Ep. 2 23:42
Products and Resources
- Electrical: Brightview Electric LLC
- Building materials: Kuiken Brothers
