3 posts / 0 new
Last post
ipe123
basement bath

I'm looking to install a full bath in my basement. I will need to "t" into the existing stack which is 4". My question is would a 3" line be large enough for the main waste line out of the basement bath. It will only be aprox. 9 feet to the stack.

canuk
Re: basement bath

I'm guessing you're running the drain for this bathroom under the concrete slab.
Chances are the existing main drain line is 4 inch in which case most codes require a 4 inch line tied into the main line usually a wye is used and not a 90 "T". under the floor.

Check with your local building department when you apply for the permit ---- they will tell you what's required for your local codes.

Rodney H
Re: basement bath

;)Yes, always use a "Y" instead of a "T". Be sure you put the "Y" WITH the flow of the waste in the drain line.

Good luck,

TV Listings

Find TV listings for This Old House and Ask This Old House in your area.