1 post / 0 new
rangercap
Balloon Framing and I-Joists

I'm getting deeper into a project extending a loft. what I assumed is true once I started to remove drywall, is that the portion of the house where I want to extend the loft (and make a full second floor) is balloon framed. I am looking for a fairly stiff second floor, so I am going with NI-40x wood I-joists. My question is connecting them to the walls (I was originally going to use an LVL ledger, by was concerned about the lag bolts in 2x lumber. I actually will be using ledgerloks, as they have a higher design strength).

Anyway... In the attached picture, I propose to install 2x8 ledger, with 2 bolts at each stud. My main question is, basically a code allowance - can I place the beams on the ledger, use filler blocking at the web, and attach the joist to the adjacent stud? I am not too worried about loading. My other concern is what type of connector to use to connect the web to the stud - 3 lags (ledgerloks) or 5-6 16d mails?

I noticed that my fire blocking should probably go above the joist, not under.

Thanks for the input.

Brian

TV Listings

Find TV listings for This Old House and Ask This Old House in your area.