Episode Descriptions

wayland

Season 13: Wayland, MA
Kirkside, 1815 Colonial Revival
This project premiered on PBS
September 1991
19 half-hour episodes; Programs #1101-1119

Program #1101
The 13th season opens with a visit to Hazel Briceno's triple-decker in Jamaica Plain, site of the 12th season's main project. We then go to Wayland, Massachusetts, site of this year's house, and meet homeowner Chris Hagger, who gives him a tour. The crew casts a cold, contractor's eye on the 1815 National Historic Register home and tells the Haggers (Chris, wife Joan, and children Andrew and Jason) that they'll need to spend a sizable chunk of their $200K budget on basic repairs and upgrades.

Program #1102
Work begins on Kirkside, with Tom Silva and crew beginning to remove the old asphalt shingles. Our host discusses roof ventilation and drip edge with our master carpenter and Tom, then catches up with Greg Clancy, an architectural conservator. With the help of an architectural model, Greg and Chris Hagger discuss the house's history and the issue of "how far back" to restore it. Meanwhile, a percolation test has been run to determine where to site the new septic field.

Program #1103
The guys and homeowner Chris Hagger discuss Chris' decision to go with architectural-grade shingles on his new roof. On the roof, the crew installs shingles and a roll-out roof vent. Our host then visits a recycling facility that processes construction debris as well as community recyclables. Back at the house, a preservation mason gives the fireplaces and chimneys the once-over, recommending a careful cleaning for the former and rebuilding for the latter.

Program #1104
The guys begin to dismantle the front portico in preparation for its restoration to its 1888 look. Our host meets George Lewis, chairman of the Wayland Historic District Commission, to discuss the commission's concerns, while up on the roof our general contractor installs a rubber roofing system. Inside, Chris Hagger and designer Jock Gifford discuss ways of improving some preliminary kitchen plans and look at the problems confronting the master suite space.

Program #1105
Mason Lenny Belleveau teaches us the ins and outs of chimney-top flue dampers from and then checks out the work of the chimney sweeps. Down at sill-level, the guys discuss the replacement of one part of the sill and the consolidation of another using an absorbable epoxy. SPNEA head restoration carpenter Tom Decatur demonstrates another version of the epoxy used for filling voids in rotted wood. The crew demolishes the kitchen, and kitchen designer Glenn Berger recaps the evolution of the kitchen Chris and Joan Hagger.

Program #1106
The guys tour the site, looking at the grading and draining work of Herb Brockert. The crew jacks the western facade and replaces rotted sections of the sill. SPNEA's Greg Clancey does some preliminary detective work in his task of determining the building's 1888 color scheme. Richard Trethewey removes the old steam boiler and discusses heating options for the upper floors.

Program #1107
The crew pours footings for the new portico, and the guys tour the demolished bathroom and kitchen, reviewing framing plans. Outside, we meet deleader Dave Rugato, whose crew is scraping lead paint off the building. Electrician Paul Kennedy shows us some of his preliminary concerns with the wiring of the new spaces, and landscape architect Tom Wirth walks the property with homeowner Joan Hagger.

Program #1108
Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.

Program #1109
Our host checks in again with Herb Brockert, who has installed the leaching pits. Middlesex Lead continues prep work on the exterior, powerwashing for a good painting surface. We visit the SPNEA lab to find out how the 1888 color scheme was discovered. Finally the guys install a new kitchen window, which gives the historic look of true divided light while providing the advantages of modern insulated glass.

Program #1110
Our host shows dry well for perimeter drainage, then catches up with our general contractor, who proposes setting the new entry door into the porch to provide shelter and pre-empt the use of a gutter along that side of the porch. They set in kitchen skylights. A paint technology expert talks about paint prep and choice of paints. At the workshop, our master carpenter turns new mahogany balusters. Back at the house, our host urges Chris and Joan to think about their kitchen lighting before the rough wiring begins.

Program #1111
The guys install a new bulkhead, while Herb Brockert puts in the septic tank, pump chamber and pump. Our host attends the Wayland Historic District Commission meeting to watch the debate over Kirkside's proposed repainting. We then visit a paint store to have the historic paint colors computer matched.

Program #1112
Our host reviews rough wiring and plumbing porgies in the kitchen, then checks in with electrician Paul Kennedy for a discussion of work box installation. Our plumbing and heating specialist explains the new zoned heating system, boiler, and hot water heater. New patio doors go in, and we visit a pair of computer modelers who have created a photo-real rendition of the proposed Kirkside kitchen.

Program #1113
Richard Trethewey shows us a gas company truck that runs on natural gas, then takes us inside to see progress on radiant floor heating. Chris Hagger accepts delivery of concrete for a new porch slab from a truck that mixes up small amounts on-site. The crew lays out the slab over the radiant tubing. The guys work with old planes to see how moldings were made long ago, while Tom Silva runs new molding for the eaves with a knife he custom made. Finally, we visit a lighting showroom to see some of the kitchen lighting the homeowners have chosen.

Program #1114
Wallboard arrives by boom truck and our host helps unload it. Electrician Paul Kennedy gives a lesson on how to cut a light switch into an old plaster wall, and we check on progress in the master bath. Outside, landscape architect Tom Wirth shows his master plan to Chris Hagger, while plants go in around the property. Back at the workshop, our master carpenter and host build redwood railings for the new portico.

Program #1115
Tom Silva explains the insulation he's been putting up in the kitchen, and in the master bath. We see a new screw gun the blueboarders are using, and then get a tour of the new air conditioning system. In the basement Paul Kennedy installs a new generation of breaker boxes. Back at the workshop our master carpenter builds column support boxes for the portico. Finally, the crew installs the glass entry door in the new back porch.

Program #1116
A licensed crew removes the two basement oil tanks. Mason Roger Hopkins splits granite for the portico foundation, while in the kitchen, designer Glenn Berger begins to install the cabinets. Our master carpenter trims out a new French door in the ballroom, and a wallpaper conservator gives us a rundown on the history and condition of the rare Zuber paper hung in the ballroom.

Program #1117
We meet Sam DeForest, who points out the features of the new fence. Our master carpenter begins to fit the new portico together, and Roger Hopkins lays in a stone walkway using scrap granite slabs. We take a tour of US Treasury Building rooms that are undergoing historic restoration. Back at Kirkside, Paul Vogan installs the vinyl flooring in the master bathroom.

Program #1118
Richard Trethewey explains ways of preventing pipe freeze-ups. In the kitchen, lighting designer Melissa Guenet and electrician Paul Kennedy show us the low-voltage and undercabinet lights, then we visit to a fabrication shop where Kirkside's countertops are being made. Back at the house, the guys put a cedar skirt on the new portico, Chris Hagger gives a tour of the house's new security system, and a wallpaper hanger instructs Chris on the papering of the master bedroom.

Program #1119
The final day at Kirkside begins in the steeple of the church, where minister Ken Sawyer gives us a look at the Paul Revere and Son bell. Down at the portico, our master carpenter installs the finishing touch: a curved and kerfed step. Out back, George Lewis and Paul Gardescu of the town's historic district commission give their opinion on the final product. Inside, Glenn Berger gives a tour of the kitchen, and we take a trip to Ohio to see how the dishwasher was built. Richard Trethewey shows off the master bath, and designer Judy George takes us through the decorated four-season porch, master bedroom and ballroom.