Happy to Be Home: Before

Who: Laurie H.
Where: Bainbridge, NY

The house needed everything, inside and out, top to bottom, including plumbing and heating. Much is left to do on the inside. The exterior work took less than six months. There were 3-4 layers of roofing up there and very little sheathing underneath (the upper layers were pretty much nailed to the lower layers). I could almost feel the house heaving a sigh of relief when that was all done and all of that weight came off.
Ask TOH users about Curb Appeal

Contribute to This Story Below