-
Building the Horseshoe Pit
3. Roger filled the frame with 6 tons of coarse sand, creating a 6-inch-thick layer that he raked level.
4. Using a sledgehammer, he drove 3-foot metal stakes into either end of the pit, leaving 36 feet between them. The stakes protrude a regulation height of 15 inches above the playing surface. -
-
This Old House To Go













Contribute to This Story Below