How to Lay Engineered Wood Floors

Laying the first course Photo:  Kindra Clineff

Once the first course is in place, drive 1 1/2 inch brads at a 45-degree angle through the strip's tongue and into the subfloor, a technique called toenailing. Repeat every 4 inches. Don't nail closer than 2 inches from the end of the strip.

Slip the second course of flooring over the tongues of the first and snug up the strips with a mallet or a tapping block and hammer.

As you go, offset end joints by at least 12 inches from those in the first course. Toenail them with the brad nailer as before, but don't facenail.

Because there are tongues and grooves milled into the ends of this flooring, the ends shouldn't be cut, except when they meet a wall or obstruction.

Tip: Choose each piece of flooring for length, not color or grain. The farther apart you stagger the end joints, the better the floor will look.

Steps

Helpful Info:
Article: Patching Damaged Wood Floors
Ask This Old House: Painting Hardwood Floors
Ask This Old House: Heating Wood Floors
Ask This Old House: Blotchy Hardwood Floors
Ask This Old House: Restoring Hardwood Floors Under Carpeting
Skill Builder: Mill Your Own Wood Flooring