Step 3: Spread the Stone

Spread the Stone to  Install a Low-Maintenance, All-Gravel Driveway
Photo: Keller + Keller
«»
Following right behind the wheel-barrows, crew members with wooden lutes spread the stone over the tar, making an even layer about a half inch thick. This step must be done quickly, before the tar cools. Stones that fall outside the driveway's edge should be raked or swept back.
Ask TOH users about Driveway & Walkway

Contribute to This Story Below