Step 1: Apply the Bitumen

Apply the Bitumen to  Install a Low-Maintenance, All-Gravel Driveway
Photo: Keller + Keller
«»
Before the crew arrives, remove any weeds or moss and sweep the driveway clean with a broom. Hot tar can't stick to wet pavement, so the paving contractor will schedule the work for a dry day. The crew starts the process by using a long wand to apply an even, ¼-inch coat of MC3000 bitumen heated to 190 degrees F.
Ask TOH users about Driveway & Walkway

Contribute to This Story Below