Step 12: Begin the Second Course

fastening the wood slats for the second course of a herringbone floor with a flooring nailer
Photo: Wendell T. Webber
«»
Butt the next slat against the blank, tongue out. Check for a tight joint, and nail it in place. Continue until the chevron reaches the opposite border. Keep adding slats until their ends reach the side borders.

Contribute to This Story Below

    More in Flooring

    Tools List

    • 30-foot tape measure
      Measuring tape
    • chalk line
      Chalk line
    • trammel
      Trammel. Make one from a piece of scrap board
    • straightedge guide
      Straightedge
    • framing square
      Framing square
    • miter saw
      Miter saw
    • mallet
      Rubber mallet
    • router
      Router and 1¼-inch flooring bit
    • speed square
      Rafter square
    • drill
      Drill/driver
    • flooring nailer
      Flooring nailer
    • circular saw
      Circular saw

    Shopping List

    Engineered tongue-and-groove strip flooring.
    Have your supplier determine how much you need, but figure on 15 percent waste.

    Feature and apron strips to frame the herringbone field.

    Flooring splines

    Molding to create a guide for the circular saw.

    ¾-inch plywood
    Get one 4x8 sheet to make the nailing blank and a straightedge.

    1½-inch drywall screwsto attach the blank to the subfloor.

    16-gauge 2-inch L-head flooring nails or 'cleats'

    Wood glue

    Painter's tape