Photo: William Wright
«»
Install a concrete or hard-plastic edging to keep the pavers from shifting. Then, starting from one corner, lay two 2-inch-diameter steel pipes about 6 feet apart and parallel on the compacted base. Cover them with ¼-inch stone, then pull a 2x4 screed board over the pipes to create a flat bed for setting the pavers. Lift out the pipes, fill the gaps, and repeat across the remaining area.















Contribute to This Story Below