Photo: Kolin Smith
«»
Follow Steps 6A and 6B to create a mortar bed on the landing, and place the perimeter treads with the flamed edges exposed and overhanging evenly. Use a straightedge to make sure the overhang matches that of the top stair tread. Use a rubber mallet to set the perimeter treads flush with the back edge of the top stair tread, maintaining the 1/16-inch-per-foot pitch all the way back to the house. Allow the treads to set overnight.
































Contribute to This Story Below