Illustration: Gregory Nemec
«»
Position the peak of the A against the nailing ledge, flush to the left edge of the finial. Drill pilot holes and screw it in place. Repeat on all sides. Finally, screw through pilot holes in the face of one framing strip and into the adjacent one's edge at each corner of the trellis.


















Contribute to This Story Below