Photo: Allison Dinner
«»
Drill pilot holes through the newel posts and ends of the handrail. Using the ⅝-inch paddle bit, drill 1-inch recesses on the outside faces of the posts, centered over the pilot holes. Hold the rail between the posts and attach it by driving 6-inch lag screws through the posts and into the rail.






















Contribute to This Story Below