Photo: Ryan Benyi
«»
For wires, halve the batt's thickness by pulling it apart. Then slide one half behind the wire and lay the other half in front. For electrical outlet boxes, install the batt, then cut a notch in its edge, using the box as a guide. For plumbing supply pipes, work the full thickness of the insulation behind the pipe to help prevent it from freezing.

















Contribute to This Story Below