Photo: Kolin Smith
«»
Using a mason's trowel, fill the trench behind the blocks with concrete, mixed to a stiff consistency, until it's level with or slightly higher than the asphalt's surface. With a pulling motion, smooth the concrete against the back of the blocks at an angle until the top of the concrete sits about 2 inches below the top of the blocks.



























Contribute to This Story Below