Step 1: Assemble the Framing

assemble the framing
Illustration: Gregory Nemec
«»
Create three identical 2x4 frames with an angled top and a center crosspiece. Connect the three frames with 2x4s at the front and back of the top and bottom. Nail 1x2s around the door openings at the front of the framing. Screw a 2x6 header across the front.
Ask TOH users about Storage

Contribute to This Story Below

    Tools List

    • jigsaw
      Jig saw
    • circular saw
      Circular saw
    • drill
      Drill/driver

    Shopping List

    1. Pressure-treated 2x4 You'll need about 12 6-footers to build the frame.

    2. pressure-treated 1x2 You'll need six 6-footers to frame the door openings.

    3. Pressure-treated 2x6 You'll need a 4 foot length to build the header above the doors.

    4. Pressure-treated 1x3 You'll need eight 6-footers to reinforce and frame the doors.

    5. Pressure-treated plywood Pick up a 4x8 sheet to build the floor and shelves.6. Tongue-and-groove cedar boards Pick up enough 6-foot planks to sheathe the 80 square feet.

    7. Construction adhesive to help secure the sheathing to the frame.

    8. 1 5/8-inch ring-shank siding nails to attach the sheathing to the frame.

    9. 3-inch deck screws to assemble the 2x4 frame.

    10. Heavy-duty hinges to support the weight of the doors.