Photo: Webb Chappell
«»
Brace the hinge post with two 2x4s: Screw the studs’ upper ends into opposite sides of the post 3 feet above grade, and stake the lower ends in the ground about 3 feet from the post base. Mix up two bags of concrete and fill around the post. Stop filling when the concrete is 3 to 4 inches below grade, enough to hide it under topsoil. Let the mix cure overnight.