Shovel a thin layer of masonry sand or stone dust over the top of the bricks. Using a large push broom, sweep the sand into the joints between the bricks (as shown). Wet the path with a hose to settle the sand, then brush more wet sand into the cracks until they are packed tightly and filled to the surface.
Let the sand settle for one week and refill any settled joints with more sand. After another week, unscrew the stakes and remove the guide rails. Finish the sides with garden edging set flush with the top of the brick.