Illustration: Gregory Nemec
«»
DAY-TO-DAY TIMELINE
Saturday: Cut the parts and make the decorative notch (Steps 1–11).
Sunday: Assemble the frame, attach the balusters, and paint the marker (Steps 12–17)
Download cut list for this project.
Saturday: Cut the parts and make the decorative notch (Steps 1–11).
Sunday: Assemble the frame, attach the balusters, and paint the marker (Steps 12–17)
Download cut list for this project.






























Contribute to This Story Below