Illustration: Gregory Nemec
«»
Day-to-day timeline
Friday: Measure and mark the driveway and remove the old paving (Steps 1-4).
Saturday: Prepare the bed, lay the cobblestones, and grout (Steps 5–17).
Friday: Measure and mark the driveway and remove the old paving (Steps 1-4).
Saturday: Prepare the bed, lay the cobblestones, and grout (Steps 5–17).



























Contribute to This Story Below