Day-to-day timeline
FRIDAY Prep the wall and steps (Steps 1-4).
SATURDAY Install and grout the veneer stones (Steps 5-12).
SUNDAY Set the bluestone treads (Step 13-15).
HOOKY DAY* Install and grout the landing pavers (Step 16-18).
* Extra day needed to allow the mortar drying time between steps