overview to build a trash shed
Illustration: Gregory Nemec
«»
Day-to-Day Timeline

Friday: Size and assemble the frame.
Saturday: Attach the sheathing and build the doors and lids.
Sunday: Install the doors and lids.
Ask TOH users about Outdoor Structures

Contribute to This Story Below

    More in Landscaping

    Tools List

    • framing square
      Framing square
    • speed square
      Speed Square
    • jigsaw
      Jigsaw
    • drill
      Drill/driver
    • finish hammer
      Hammer with nailset

    Shopping List

    2x4 to frame the shed and build the doors. Get eleven 8-foot boards.

    1x6 tongue-and-groove siding. Pick up prestained boards or stain them yourself before installation. Get enough to cover about 75 square feet.

    1 ¼x6 pressure-treated decking to frame the doors and lid. Get seven 8-foot boards.

    Construction adhesive to glue the sheathing.

    4-inch door hinges to attach each lid and the bifold doors to the framing. Get 10. Continuous (piano) hinges to create the bifold doors. Get two stainless steel 30-inch hinges.

    3½-inch stainless-steel deck screws

    2½-inch stainless-steel deck screws

    1 5/8-inch stainless-steel deck screws

    1 5⁄8-inch stainless-steel siding nails