Illustration Gregory Nemec
«»
Day-to-day timeline
Friday: Sand and clean the floor; paint the base color.
Saturday: Lay out, tape, and paint the pattern.
Sunday: Apply a second coat or polyurethane as needed.
Friday: Sand and clean the floor; paint the base color.
Saturday: Lay out, tape, and paint the pattern.
Sunday: Apply a second coat or polyurethane as needed.

























Contribute to This Story Below