Illustration: Gregory Nemec
«»
Day-to-Day Timeline:
Friday: Lay out the size and shape of the patio, and arrange the placement of the stones.
Saturday: Dig out the area, and create the base layer.
Sunday: Position and level the stones, then fill the joints.
Friday: Lay out the size and shape of the patio, and arrange the placement of the stones.
Saturday: Dig out the area, and create the base layer.
Sunday: Position and level the stones, then fill the joints.

























Contribute to This Story Below