Illustration: Gregory Nemec
«»
Day-to-Day Timeline
Friday: Size the trellis; cut and notch all the frame pieces.
Saturday: Build the three panels and join together into one.
Sunday: Dig holes; set the trellis in place.
Friday: Size the trellis; cut and notch all the frame pieces.
Saturday: Build the three panels and join together into one.
Sunday: Dig holes; set the trellis in place.



























Contribute to This Story Below